North Dallas (75230) & close-in DFW · Sun–Thu (Closed Fri & Sat) noskotx@gmail.com Text (945) 239-5974

Our work

Before & after

Real jobs, photographed on site. Drag the handle on each photo to compare.

Before: half bath with rotted, water-damaged subfloor
After: new octagon mosaic tile, deep blue walls, black hardware
BeforeAfter
Before: half bath with rotted, water-damaged subfloorBefore
After: new octagon mosaic tile, deep blue walls, black hardwareAfter
Bathroom

Bathroom

Half-bath subfloor, tile & paint

  • Pulled the damaged flooring and replaced the rotted subfloor
  • Set and grouted black-and-white octagon mosaic tile
  • Painted the walls deep blue and cleaned up the baseboards
  • Installed a black towel ring and toilet-paper holder
Get an estimate for a job like this
Old tile being removed, with the subfloor exposed, before the new floor
Newly installed light tile floor in the same doorway
BeforeAfter
Old tile being removed, with the subfloor exposed, before the new floorBefore
Newly installed light tile floor in the same doorwayAfter
Flooring

Flooring

Flooring before & after

Old tile was pulled up and a new tile floor was installed in the same doorway.

Get an estimate for a job like this
Before: square drywall cut-out with the stud exposed
After: patched wall with matched texture, primed and painted
BeforeAfter
Before: square drywall cut-out with the stud exposedBefore
After: patched wall with matched texture, primed and paintedAfter
Drywall

Drywall

Drywall patch & texture match

  • Fastened new drywall to the exposed stud
  • Taped the seams and floated joint compound in thin coats
  • Matched the existing knockdown texture across the patch
  • Primed and painted so the repair blends with the wall
Get an estimate for a job like this

Got something like this at your place?

Text a few photos, or book online. Appointments Sunday through Thursday.

Text Free Estimate